MONITORING
3. In the Test Type field, choose Built-In, and then choose Idle Workload from the list.
4. Click the Script Variables tab, and enter these values:
6. (Optional) Click the Stop Conditions tab to set a stop condition.
8. (Optional) Select metrics to monitor.
10. Click Start Test.
See Also